A new case study explores a real Alberta Montney sour gas system using Geologic’s data to show where capacity is limited and where there may be opportunities to unlock additional production.Typically most well analysis stops at the wellhead and most facility analysis stops at the plant. The real constraint often sits between them, in the gathering systems, compressors and batteries that connect wells to facilities.Read the case study to see where infrastructure could be limiting production.Why gathering networks can create both efficiency and risk.How infrastructure bottlenecks can limit development options.How water infrastructure shapes development options.How historical utilization can help identify infrastructure opportunities.